🧱 Concreting in Sunshine Coast
Compare 86 concreting operators across Sunshine Coast. Driveways, paths, slabs and decorative concrete.
Plain driveway, per square metre: $95 – $165
Concrete work in SEQ covers everything from house slabs to decorative pours (exposed aggregate, stamped, polished). Pricing varies hugely by finish: a plain driveway and a polished-concrete slab look the same on quote until you read the line items.
Concreting operators in Sunshine Coast
Verified operators ranked first. Listed entries are sourced from public records and may not yet be claimed by the operator.
ABH Concreting Pty Ltd
Listed📍 Sippy Downs
Ace Retaining Walls
Listed📍 Landsborough
Ahead Tilt Panel Constructions
ListedArty Concrete
Listed📍 Glass House Mountains
Ausimix Concrete
ListedBayset Kunda Park
ListedBayset Noosaville
Listed📍 Noosaville
BEAR Civil & Concreting
Listed📍 Eumundi
Best Concrete
Listed📍 Mooloolaba
Boral Concrete
Listed📍 Maroochydore
Bryce Concrete Pumping
Listed📍 Maroochydore
C J P Concrete Services
Listed📍 Maroochydore
C.I.A Concrete
ListedCampbell Construction Co
ListedCentury Concrete Constructions
ListedClassic Concrete Cutting
Listed📍 Palmwoods
Classic Concrete Pumping
ListedClassic Noosa Concrete Services Pty Ltd
ListedCN Concreting
Listed📍 Noosaville
Coastal Covercrete
ListedCoastal Landscape Supplies
ListedComplete Concrete Cutting (QLD)
ListedConcrete Cutting Sunshine Coast
Listed📍 Alexandra Headland
Conflor (Concrete & Flooring Solutions)
Listed📍 Maroochydore
Coolum Exteriors
ListedCooroy Landscape Supplies & Garden Centre
Listed📍 Cooroy
Custom Retaining Solutions Pty Ltd
Listed📍 Cooroy
Diesel's Concrete Cutting & Scanning
ListedEastick Contracting
ListedEasy Done Concreting
Listed📍 Landsborough
Showing top 30 of 86 operators. Refine by area below.
📅 When to book
Plain pours 2-4 weeks. Decorative work (exposed aggregate, polished, stamped) needs 3-6 weeks for material lead-time. Avoid wet-season pours where possible.
📋 License & verification
Concrete work over $3,300 requires QBCC license. Structural slabs (homes, retaining) need engineer-certified design + QBCC builder, not just a concreter.
⚠️ Common mistakes
- •Skipping the moisture barrier on a slab — leads to rising damp years later
- •Ordering inadequate concrete strength for the application — N20 for footpath, N25 minimum for driveway, N32+ for structural
- •Under-speccing reinforcement or thickness for the load — a driveway carrying vehicles needs more than a path; under-spec concrete cracks and can't be patched cheaply
Frequently asked questions
How long before I can drive on a new driveway?
Foot traffic at 24 hours, light vehicles at 7 days, heavy trucks at 28 days when concrete reaches design strength. Don't park heavy vehicles or trailers on it before then.
What's the difference between exposed aggregate and stamped concrete?
Exposed aggregate reveals the stone within the mix — durable, slip-resistant, costs ~30% more than plain. Stamped concrete is texturally pressed to look like pavers or tiles — high upfront cost but no jointing maintenance.
How much does a concrete driveway cost in SEQ?
Plain concrete is cheapest per square metre; exposed aggregate and coloured finishes cost more, and stamped or polished more again. Site prep, fall, drainage and access drive the final number — get an on-site measure-and-quote.
How long before I can drive on new concrete?
You can usually walk on it after 24-48 hours, but wait about 7 days before driving a car onto a new driveway and up to 28 days for full strength. Loading it early is a common cause of cracking.