Concreting — Southern, Gold Coast
Compare 10 concreting operators servicing Southern. Driveways, paths, slabs and decorative concrete.
Plain driveway, per square metre: $95 – $165
The southern Gold Coast from Robina to Coolangatta is a mature housing market with steady renovation activity. Proximity to the NSW border means some operators service both states.
Concrete work in SEQ covers everything from house slabs to decorative pours (exposed aggregate, stamped, polished). Pricing varies hugely by finish: a plain driveway and a polished-concrete slab look the same on quote until you read the line items.
Concreting operators covering Southern
Showing all Gold Coast operators — area-specific data is being expanded.
A1 Concreting Services Gold Coast
ListedOxenford
Hy-tec Concrete & Aggregates Burleigh Heads
ListedBurleigh Heads
Quick Core And Sawing Pty Ltd
ListedOrmeau
SEQ Concrete Cutting Gold Coast
ListedSouthport
SEQ Concreting Services Gold Coast
ListedOrmeau
The Concrete Co Qld Gold Coast
ListedSurfers Paradise
Get up to 3 quotes for concreting in Southern
We send your job to up to 3 concreting operators near Southern. Confirm availability, credentials and pricing directly before booking.
Prefer to call? Pick any operator above and call them direct — no middleman.
Suburbs we cover in Southern
📅 When to book
Plain pours 2-4 weeks. Decorative work (exposed aggregate, polished, stamped) needs 3-6 weeks for material lead-time. Avoid wet-season pours where possible.
📋 License & verification
Concrete work over $3,300 requires QBCC license. Structural slabs (homes, retaining) need engineer-certified design + QBCC builder, not just a concreter.
⚠️ Common mistakes
- •Skipping the moisture barrier on a slab — leads to rising damp years later
- •Ordering inadequate concrete strength for the application — N20 for footpath, N25 minimum for driveway, N32+ for structural
- •Under-speccing reinforcement or thickness for the load — a driveway carrying vehicles needs more than a path; under-spec concrete cracks and can't be patched cheaply
Concreting in Southern — FAQs
How long before I can drive on a new driveway?
Foot traffic at 24 hours, light vehicles at 7 days, heavy trucks at 28 days when concrete reaches design strength. Don't park heavy vehicles or trailers on it before then.
What's the difference between exposed aggregate and stamped concrete?
Exposed aggregate reveals the stone within the mix — durable, slip-resistant, costs ~30% more than plain. Stamped concrete is texturally pressed to look like pavers or tiles — high upfront cost but no jointing maintenance.
How much does a concrete driveway cost in SEQ?
Plain concrete is cheapest per square metre; exposed aggregate and coloured finishes cost more, and stamped or polished more again. Site prep, fall, drainage and access drive the final number — get an on-site measure-and-quote.
How long before I can drive on new concrete?
You can usually walk on it after 24-48 hours, but wait about 7 days before driving a car onto a new driveway and up to 28 days for full strength. Loading it early is a common cause of cracking.